| Project: | Development of an automated control system for a heavy-duty high-pulse generator |
|---|---|
| Client: | INSTITUTE OF ELECTROMAGNETIC RESEARCH Ltd |
| Date: | |
| Project details: | Development and implementation of a control system of the Electromagnetic Pulse Generator (EPG), to provide control of EPG and its service systems:
Develop an interface for communication with the external control system. |
| Executed work and achieved results: | Implementation of a centralized control system to ensure the following functions:
The automated GEMI control system was developed, installed, and successfully implemented. ASA -Projekt took part in complex tests of the prototype and performed all the commissioning works. |