Project:

Development of an automated control system for a heavy-duty high-pulse generator

Client:INSTITUTE OF ELECTROMAGNETIC RESEARCH Ltd
Date:
Project details:

Development and implementation of a control system of the Electromagnetic Pulse Generator (EPG), to provide control of EPG and its service systems:

  • Vacuuming system.
  • Purging system.
  • High-voltage capacitor charging units.

Develop an interface for communication with the external control system.

Executed work and achieved results:

Implementation of a centralized control system to ensure the following functions:

  • Receiving and processing signals from sensors and actuators of GEMI and its service systems.
  • Issuing commands to the executive mechanisms.
  • Control of GEMI and its service systems parameters.
  • Issuing warning messages and stopping the process in case of detecting alarm parameters.
  • Automatic control of GEMI and its systems.
  • Transfer of information about the technological process to the service laptop screen.
  • Creation of the control process archive.
  • Exchange of information with an external control system.

The automated GEMI control system was developed, installed, and successfully implemented. 

ASA -Projekt took part in complex tests of the prototype and performed all the commissioning works.